N67-W52 CONNECTOR over SR-67 PROSPECT MAGNOL

11-SD-067-R1.80-SNT · County 073, California · Built 2011 · 2 Lanes · 15,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1122G
Year Built
2011
Length
567 m (1860.2 ft)
Max Span
54.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
15,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.