SR 56 ON-RAMP over GONZALES CREEK

11-SD-056-2.97-SD · County 073, California · Built 2004 · 3 Lanes · 2,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1078K
Year Built
2004
Length
111.2 m (364.8 ft)
Max Span
45 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
2,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.