STATE ROUTE 76 EB over MISSION AVE
11-SD-076-M2.88-OCN · County 073, California · Built 1999 · 2 Lanes · 23,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.219983, -117.338781
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 27 years old.
Nearby Bridges
STATE ROUTE 76 WB over MISSION AVE
Built 1999
STATE ROUTE 76 over FIRESIDE CHANNEL
Built 1992
FOUSSAT ST over SAN LUIS REY RIVER
Built 1984
STATE ROUTE 76 EB over EL CAMINO REAL
Built 1999
STATE ROUTE 76 WB over EL CAMINO REAL
Built 1999
MISSION AVENUE over MISSION KNOLL CREEK
Built 1943
BENET ROAD over SAN LUIS REY RIVER
Built 1997
EL CAMINO REAL over LOMA ALTA CREEK
Built 1948
STATE ROUTE 76 WB over MISSION AVE
Built 1999
STATE ROUTE 76 EB over MISSION AVE
Built 1999
Bridge Details
- Structure #
- 57 1017R
- Year Built
- 1999
- Length
- 226.5 m (743.1 ft)
- Max Span
- 43 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 23,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.