BALBOA AVE EB over ROUTE15

11-SD-015-R9.23-SD · County 073, California · Built 1982 · 3 Lanes · 13,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57 0878R
Year Built
1982
Length
93.3 m (306.1 ft)
Max Span
46.3 m
Width
15.4 m (50.5 ft)
Lanes
3
Daily Traffic
13,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.