S/B 805 MAINLINE over INTERSTATE 5

11-SD-805-0.50-SD · County 073, California · Built 1973 · 5 Lanes · 50,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0839F
Year Built
1973
Length
170.1 m (558.1 ft)
Max Span
69.8 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
50,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.