I-5 & RAMPS over PARADISE CREEK

11-SD-005-R10.01-NATC · County 073, California · Built 1965 · 14 Lanes · 154,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
57 0483
Year Built
1965
Reconstructed
1989
Length
11 m (36.1 ft)
Max Span
2.4 m
Width
80 m (262.5 ft)
Lanes
14
Daily Traffic
154,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.