CLAREMONT MESA WB over ROUTE 163 & RAMPS

11-SD-163-8.81-SD · County 073, California · Built 1958 · 3 Lanes · 18,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 0368
Year Built
1958
Reconstructed
2007
Length
79.7 m (261.5 ft)
Max Span
19.8 m
Width
16.3 m (53.5 ft)
Lanes
3
Daily Traffic
18,600
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.