INTERSTATE 5 over CARMEL MOUNTAIN RD

11-SD-005-R31.80-SD · County 073, California · Built 1966 · 15 Lanes · 203,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
57 0314
Year Built
1966
Reconstructed
2007
Length
60.3 m (197.8 ft)
Max Span
30.3 m
Width
80.3 m (263.5 ft)
Lanes
15
Daily Traffic
203,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.