STATE ROUTE 78 over MISSION RD NCTD BNSF RY

11-SD-078-14.99-SMCS · County 073, California · Built 1962 · 8 Lanes · 158,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
57 0135
Year Built
1962
Reconstructed
2013
Length
109.1 m (357.9 ft)
Max Span
30.5 m
Width
43.5 m (142.7 ft)
Lanes
8
Daily Traffic
158,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.