GOETZ RD over SALT CREEK
100 FT N/O NEWPORT RD · County 065, California · Built 2024 · 4 Lanes · 14,000 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.678056, -117.234694
This bridge is in worse condition than 20% of bridges in County 065. The average bridge in California is 0 years old; this one is 2 years old.
Nearby Bridges
CANYON HILLS ROAD over COTTONWOOD CREEK
Built 2014
CEDAR MESA DRIVE over COTTONWOOD CREEK
Built 2006
RAILROAD CANYON RD over COTTONWOOD CANYON CREEK
Built 1975
MURRIETA ROAD over SALT CREEK CHANNEL
Built 1981
MC CALL BOULEVARD over GOLF COURSE DRAIN
Built 1969
SUN CITY BOULEVARD over MCCALL BOULEVARD DRAIN
Built 1975
INTERSTATE 215 SB over SALT CREEK
Built 1979
ANTELOPE ROAD over SALT CREEK CHANNEL
Built 1991
NEWPORT ROAD WB over INTERSTATE 215
Built 2000
MCCALL BLVD over INTERSTATE 215
Built 1966
Bridge Details
- Structure #
- 56C0662
- Year Built
- 2024
- Length
- 39 m (128 ft)
- Max Span
- 39 m
- Width
- 30.8 m (101 ft)
- Lanes
- 4
- Daily Traffic
- 14,000
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.