FOOTHILL PARKWAY over HAGADOR CANYON CREEK
0.6 MI W/O LINCOLN AVE · County 065, California · Built 2006 · 4 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.841922, -117.598214
This bridge is in worse condition than 68.1% of bridges in County 065. The average bridge in California is 0 years old; this one is 20 years old.
Nearby Bridges
FOOTHILL PARKWY NB over MWD PIPELINE
Built 2017
FOOTHILL PARKWY SB over MWD PIPELINE
Built 2017
POMONA ROAD over OAK STREET CHANNEL
Built 1993
GARRETSON AVENUE over MAIN STREET WASH
Built 1975
SIXTH STREET over OAK STREET CHANNEL
Built 1993
MAPLE STREET over ROUTE 91
Built 2017
W 91 ON-RAMP over ROUTE 91
Built 2017
SMITH AVENUE over ROUTE 91
Built 1992
E91-MAPLE STREET over SERFAS CLUB DR ON-RAMP
Built 2017
STATE ROUTE 91 over SERFAS DRIVE
Built 1970
Bridge Details
- Structure #
- 56C0609
- Year Built
- 2006
- Length
- 31.2 m (102.4 ft)
- Max Span
- 30 m
- Width
- 27.4 m (89.9 ft)
- Lanes
- 4
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.