PALM CANYON DRIVE over THUNDERBIRD CHANNEL

2.3 MI. SE/O DATE PALM DR · County 065, California · Built 1964 · 6 Lanes · 37,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56C0504
Year Built
1964
Reconstructed
2000
Length
23.8 m (78.1 ft)
Max Span
11.3 m
Width
28.1 m (92.2 ft)
Lanes
6
Daily Traffic
37,000
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.