CHUCKWALLA VLY RD over TARANTULA DITCH

1.5 MI E/O CORN SPRNGS RD · County 065, California · Built 1931 · 2 Lanes · 40 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
56C0103
Year Built
1931
Reconstructed
1944
Length
12.5 m (41 ft)
Max Span
5.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
40
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$382,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.