AVENUE 66 over ROUTE 111

08-RIV-111-18.28 · County 065, California · Built 2022 · 2 Lanes · 1,872 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0884
Year Built
2022
Length
242 m (794 ft)
Max Span
61 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
1,872
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.