JEFFERSON ST over INTERSTATE 10

08-RIV-010-R52.40-IND · County 065, California · Built 2018 · 6 Lanes · 5,520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0862
Year Built
2018
Length
136.1 m (446.5 ft)
Max Span
75.8 m
Width
47.1 m (154.5 ft)
Lanes
6
Daily Traffic
5,520
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.