ROUTE 74 over HURKEY CREEK

08-RIV-074-62.99 · County 065, California · Built 2016 · 2 Lanes · 3,111 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0790
Year Built
2016
Length
14 m (45.9 ft)
Max Span
11.1 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
3,111
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.