INTERSTATE 15 NB over RR CANYON RD

08-RIV-015-19.16-ESN · County 065, California · Built 1982 · 3 Lanes · 61,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0714R
Year Built
1982
Reconstructed
2022
Length
44.2 m (145 ft)
Max Span
44.2 m
Width
20.7 m (67.9 ft)
Lanes
3
Daily Traffic
61,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.