INTERSTATE 10 EB over EAGLE MOUNTAIN ROAD

08-RIV-010-R102.01 · County 065, California · Built 1967 · 2 Lanes · 11,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0575R
Year Built
1967
Length
33.2 m (108.9 ft)
Max Span
14.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
11,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.