INTERSTATE 15 NB over TEMESCAL CANYON ROAD

08-RIV-015-33.25 · County 065, California · Built 1979 · 3 Lanes · 60,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
56 0542R
Year Built
1979
Length
44.5 m (146 ft)
Max Span
44.5 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
60,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.