STATE ROUTE 60 over PYRITE STREET

08-RIV-060-R5.58 · County 065, California · Built 1975 · 10 Lanes · 242,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0528
Year Built
1975
Reconstructed
2008
Length
58.5 m (191.9 ft)
Max Span
34.7 m
Width
50 m (164 ft)
Lanes
10
Daily Traffic
242,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.