STATE ROUTE 60 over DAY STREET

08-RIV-060-13.31-RIV · County 065, California · Built 1962 · 11 Lanes · 130,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0477
Year Built
1962
Reconstructed
2007
Length
45.7 m (149.9 ft)
Max Span
24.4 m
Width
57.8 m (189.6 ft)
Lanes
11
Daily Traffic
130,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.