STATE ROUTE 60 over SANTA ANA RIVER

08-RIV-060-10.51-RIV · County 065, California · Built 1962 · 8 Lanes · 126,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0410
Year Built
1962
Reconstructed
1998
Length
320 m (1049.9 ft)
Max Span
32.5 m
Width
45.6 m (149.6 ft)
Lanes
8
Daily Traffic
126,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.