STATE ROUTE 79 over TEMECULA CREEK

08-RIV-079-7.07 · County 065, California · Built 1980 · 2 Lanes · 27,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
56 0188
Year Built
1980
Length
60.7 m (199.1 ft)
Max Span
24.4 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
27,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.