B STREET over SAN DIEGO CREEK

0.1 MI. W/O PACIFICA · County 059, California · Built 1993 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
55C0669
Year Built
1993
Length
42.7 m (140.1 ft)
Max Span
41.9 m
Width
20.7 m (67.9 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.