QUARTZ STREET over E GRDN GRVE WNTRSBG CHAN
0.1 M S/O EDINGER · County 059, California · Built 1997 · 2 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.728744, -117.975778
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 29 years old.
Nearby Bridges
MAGNOLIA ST over E GRDN GRVE WINTRBG CHAN
Built 1961
INTERSTATE 405 over E GARDEN GROVE CHANNEL
Built 1966
NEWLAND STREET over ROUTE 405
Built 2024
WOODRUFF STREET over E GRDN GRVE WNTRSBG CHAN
Built 1997
EDINGER AVE over ROUTE 405
Built 2024
MAGNOLIA STREET over ROUTE 405
Built 2021
SB39/SB405 ON-RAMP over ROUTE 405
Built 2024
BUSHARD STREET over E GRDN GRVE WNTERBG CHAN
Built 1961
INTERSTATE 405 over ROUTE 39
Built 1965
ON-RAMP 405 over ROUTE 39
Built 2024
Bridge Details
- Structure #
- 55C0649
- Year Built
- 1997
- Length
- 19 m (62.3 ft)
- Max Span
- 4.4 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.