LAS PALMAS DRIVE over EQUESTRIAN TRAIL

0.15 MI W/O HARBOR BLVD. · County 059, California · Built 1998 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0638
Year Built
1998
Length
24.4 m (80.1 ft)
Max Span
23.6 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
3,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.