HARVARD AVE over SAN DIEGO CREEK CHANNEL

100 S/O BARRANCA PKWY · County 059, California · Built 1988 · 6 Lanes · 20,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
55C0567
Year Built
1988
Length
30.6 m (100.4 ft)
Max Span
15.2 m
Width
30.8 m (101 ft)
Lanes
6
Daily Traffic
20,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.