EL CAMINO REAL over BROWNING AVE STORM DRAIN
50 SE/O BROWNING AVENUE · County 059, California · Built 1986 · 4 Lanes · 10,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.729069, -117.808172
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 40 years old.
Nearby Bridges
TUSTIN RANCH ROAD over INTERSTATE 5
Built 1992
BROWNING AVENUE over EL MODENA-IRVINE CHANNEL
Built 1980
PARKCENTER DRIVE over EL MODENA-IRVINE CHANNEL
Built 1987
INTERSTATE 5 over RED HILL AVE
Built 1992
TUSTIN RANCH ROAD over EL MODEN- IRVINE CHANNEL
Built 1987
RIVERFORD ROAD over REDHILL CHANNEL
Built 1980
EL CAMINO REAL over EL MODENA-IRVINE CHANNEL
Built 1987
BENT TWIG LANE over REDHILL CHANNEL
Built 1980
INTERSTATE 5 over EL MODENA-IRVINE CHANNEL
Built 1992
INTERSTATE 5 over MYFORD CREEK
Built 1958
Bridge Details
- Structure #
- 55C0539
- Year Built
- 1986
- Length
- 8.2 m (26.9 ft)
- Max Span
- 2.4 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 10,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.