W/B SNTA MRGTA PWY over ARROYO TRABUCO

0.2 MI E/O ALICIA PARKWAY · County 059, California · Built 1991 · 3 Lanes · 29,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0520L
Year Built
1991
Length
367.9 m (1207 ft)
Max Span
56.1 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
29,150
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.