AVENIDA VAQUERO over PRIMA DESHECHA CANADA

50 E/O CAMINO CAPISTRANO · County 059, California · Built 1974 · 3 Lanes · 4,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
55C0422
Year Built
1974
Length
6.7 m (22 ft)
Max Span
3 m
Width
23.2 m (76.1 ft)
Lanes
3
Daily Traffic
4,000
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.