CAMPUS DRIVE over SAN DIEGO CREEK CHANNEL

100 NW UNIVERSITY DR · County 059, California · Built 1974 · 3 Lanes · 17,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
55C0393
Year Built
1974
Length
110.4 m (362.2 ft)
Max Span
19.8 m
Width
25.6 m (84 ft)
Lanes
3
Daily Traffic
17,000
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.