HAMILTON AVENUE over TALBERT CHANNEL

0.25 MI W/O BUSHARD ST · County 059, California · Built 1976 · 5 Lanes · 12,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
55C0376
Year Built
1976
Length
27.1 m (88.9 ft)
Max Span
3 m
Width
30.5 m (100.1 ft)
Lanes
5
Daily Traffic
12,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.