DYER ROAD over SANTA ANA DELHI CHANNEL

100 E/O FLOWER ST · County 059, California · Built 1971 · 5 Lanes · 23,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
55C0363
Year Built
1971
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Width
24.6 m (80.7 ft)
Lanes
5
Daily Traffic
23,000
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.