MAIN STREET W/B over SAN DIEGO CREEK CHANNEL

0.3 MI E JAMBOREE RD · County 059, California · Built 1969 · 3 Lanes · 8,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0339L
Year Built
1969
Reconstructed
1988
Length
80.6 m (264.4 ft)
Max Span
17.7 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
8,700
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.