MAIN STREET W/B over SAN DIEGO CREEK CHANNEL
0.3 MI E JAMBOREE RD · County 059, California · Built 1969 · 3 Lanes · 8,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.679178, -117.8355
This bridge is in worse condition than 62.4% of bridges in County 059. The average bridge in California is 0 years old; this one is 57 years old.
Nearby Bridges
MAIN STREET E/B over SAN DIEGO CREEK CHANNEL
Built 1988
MAIN STREET over BARRANCA CHANNEL
Built 1975
CORONADO over SAN DIEGO CREEK CHANNEL
Built 1989
INTERSTATE 405 over SAN DIEGO CREEK CHANNEL
Built 1968
RAMP/CONNECTOR 405 over LANE CHANNEL
Built 1968
JAMBOREE ROAD over BARRANCA CHANNEL
Built 1975
JAMBOREE BLVD over ROUTE 405
Built 1968
HARVARD AVENUE over INTERSTATE 405
Built 1983
INTERSTATE 405 over SAN JOAQUIN CHANNEL
Built 1968
MICHELSON DRIVE over SAN DIEGO CREEK CHANNEL
Built 1976
Bridge Details
- Structure #
- 55C0339L
- Year Built
- 1969
- Reconstructed
- 1988
- Length
- 80.6 m (264.4 ft)
- Max Span
- 17.7 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 8,700
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.