HIGHLAND AVE over FULLERTON CREEK CHANNEL

0.2 MI S/O VALENCIA DR · County 059, California · Built 1959 · 3 Lanes · 8,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0294
Year Built
1959
Reconstructed
1987
Length
11 m (36.1 ft)
Max Span
10.1 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
8,500
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.