RICHMAN AVE over BREA CREEK CHANNEL

50 N/O CHAPMAN AVE · County 059, California · Built 1940 · 2 Lanes · 4,653 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0225
Year Built
1940
Reconstructed
1970
Length
14.6 m (47.9 ft)
Max Span
14.6 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
4,653
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.