N/B MOULTON PKWY over ALISO CREEK
1.5 MI S EL TORO RD · County 059, California · Built 1969 · 3 Lanes · 11,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.589786, -117.711783
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 57 years old.
Nearby Bridges
S/B MOULTON PKWY over ALISO CREEK
Built 1987
W/B LGNA HILLS DR over ALISO CREEK
Built 1985
E/B LGNA HILLS DR over ALISO CREEK
Built 1985
VIA LOMAS over BIKEWAY UNDERCROSSING
Built 1970
ALISO CREEK ROAD over SR 73 & RAMPS
Built 1996
SR 73 NB over ALISO CREEK
Built 1996
SR 73 NB over ALISO VIEJO PKWY
Built 1996
SR 73 SB over ALISO CREEK
Built 1996
SR 73 SB over ALISO VIEJO PKWY
Built 1996
ALICIA PARKWAY over STATE ROUTE 73
Built 1996
Bridge Details
- Structure #
- 55C0221R
- Year Built
- 1969
- Reconstructed
- 1983
- Length
- 57.3 m (188 ft)
- Max Span
- 15.8 m
- Width
- 15.9 m (52.2 ft)
- Lanes
- 3
- Daily Traffic
- 11,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.