DALE STREET over FULLERTON CREEK CHANNEL

0.15 MI. S/O WHITAKER ST. · County 059, California · Built 1958 · 2 Lanes · 6,197 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0194
Year Built
1958
Reconstructed
1964
Length
11 m (36.1 ft)
Max Span
10.7 m
Width
21.9 m (71.9 ft)
Lanes
2
Daily Traffic
6,197
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.