CHAPMAN AVENUE over ANAHEIM-BARBER CITY CHA

0.4 MI E/O ROUTE 39 · County 059, California · Built 1959 · 5 Lanes · 20,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
55C0077
Year Built
1959
Length
7.3 m (24 ft)
Max Span
3.7 m
Width
29.1 m (95.5 ft)
Lanes
5
Daily Traffic
20,800
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.