MAIN ST over SANTIAGO CREEK CHANNEL

0.2 MI N/O ROUTE 5 FWY · County 059, California · Built 1918 · 7 Lanes · 37,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0055
Year Built
1918
Reconstructed
1975
Length
61.9 m (203.1 ft)
Max Span
19.5 m
Width
31.1 m (102 ft)
Lanes
7
Daily Traffic
37,000
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.