ORANGEWOOD AVENUE over SANTA ANA RIVER CHANNEL
0.1 MI. W/O ROUTE 57 FWY · County 059, California · Built 1966 · 5 Lanes · 17,200 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.795742, -117.878794
This bridge is in worse condition than 97.6% of bridges in County 059. The average bridge in California is 0 years old; this one is 60 years old.
Nearby Bridges
STATE ROUTE 57 over ORANGEWOOD AVE
Built 1976
STATE ROUTE 57 over SANTA ANA RIVER
Built 1976
MAPLE AVENUE over BITTERBUSH CHANNEL
Built 1973
STATE ROUTE 57 over BNSF RY AMTRAK METROLINK
Built 1976
STATE ROUTE 57 over CHAPMAN AVE
Built 1976
CHAPMAN AVENUE over SANTA ANA RIVER CHANNEL
Built 1976
RTE 57 & CHAPMAN over BITTERBUSH CHANNEL
Built 1976
INTERSTATE 5 over CHAPMAN AVE
Built 2000
INTERSTATE 5 over STATE COLLEGE BLVD
Built 2000
N5-STATE COL OFFRA over CHAPMAN AVE-N5 ON-RAMP
Built 2000
Bridge Details
- Structure #
- 55C0050
- Year Built
- 1966
- Reconstructed
- 1981
- Length
- 106.4 m (349.1 ft)
- Max Span
- 16.2 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 5
- Daily Traffic
- 17,200
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,302,000
- Total Project Cost
- $3,867,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.