VIA LIDO over WEST LIDO CHANNEL

0.3 MI. E/O NEWPORT BLVD · County 059, California · Built 1930 · 2 Lanes · 12,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55C0013
Year Built
1930
Reconstructed
1977
Length
57.6 m (189 ft)
Max Span
18.9 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
12,500
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.