S405-E22 over INTERSTATE 405

12-ORA-405-20.75-SLB · County 059, California · Built 2015 · 3 Lanes · 50,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 1101F
Year Built
2015
Length
231.3 m (758.9 ft)
Max Span
91.4 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
50,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.