S5&S57-W22 CONNECT over W22-METROPOLITAN OFF RMP

12-ORA-005-34.55-SA · County 059, California · Built 2008 · 2 Lanes · 16,285 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
55 1088F
Year Built
2008
Length
91 m (298.6 ft)
Max Span
42.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
16,285
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.