S5-EUCLID STREET over INTERSTATE 5
12-ORA-005-39.56-ANA · County 059, California · Built 2000 · 1 Lanes · 7,345 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.837964, -117.946439
This bridge is in worse condition than 69% of bridges in County 059. The average bridge in California is 0 years old; this one is 26 years old.
Nearby Bridges
CHIPPEWA AVENUE over CARBON CREEK CHANNEL
Built 1960
EUCLID STREET over INTERSTATE 5 & UP RR
Built 2000
EUCLID STREET over CARBON CREEK CHANNEL
Built 1959
INTERSTATE 5 over CARBON CREEK
Built 2002
EUCLID-S5 ON-RAMP over INTERSTATE 5
Built 2000
VALLEY STREET over CARBON CREEK CHANNEL
Built 1960
LOARA STREET over CARBON CREEK CHANNEL
Built 1961
BROOKHURST STREET over CARBON CREEK CHANNEL
Built 1959
N5-BRKHURST OFF-RA over INTERSTATE 5 RAMP
Built 2002
BROOKHURST STREET over UP RR
Built 2002
Bridge Details
- Structure #
- 55 0843
- Year Built
- 2000
- Length
- 256.5 m (841.5 ft)
- Max Span
- 70.8 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 1
- Daily Traffic
- 7,345
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.