BRYAN AVENUE over STATE ROUTE 261

12-ORA-261-1.20-TUS · County 059, California · Built 1998 · 4 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
55 0764
Year Built
1998
Length
81.7 m (268 ft)
Max Span
40.8 m
Width
35.4 m (116.1 ft)
Lanes
4
Daily Traffic
5,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.