S73-BISON OFF-RAMP over MACARTHUR-S73 ON-RAMP

12-ORA-073-23.60-IRVN · County 059, California · Built 1996 · 1 Lanes · 6,270 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0744K
Year Built
1996
Length
111 m (364.2 ft)
Max Span
50 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
6,270
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.