SR 241 SB over TOWNE CENTRE DR

12-ORA-241-23.62-LKFR · County 059, California · Built 1993 · 3 Lanes · 21,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
55 0709L
Year Built
1993
Reconstructed
1998
Length
47.9 m (157.2 ft)
Max Span
47.9 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
21,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.