5-57 HOV over I 5 NB I 5 NB HOV 22-N5
12-ORA-057-10.79R-SA · County 059, California · Built 1995 · 2 Lanes · 8,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.782003, -117.879414
This bridge is in worse condition than 21.9% of bridges in County 059. The average bridge in California is 0 years old; this one is 31 years old.
Nearby Bridges
S57-S5 CONNECTOR over I 5; 22-N55 CONN
Built 1995
S57-W22 CONNECTOR over I 5 & CONNECTOR RAMPS
Built 1995
BRISTOL ST-LA VETA over I 5 & CONS TO SR 57 & 22
Built 1992
I 5 over SANTA ANA RIVER
Built 1999
N5-N57 CONNECTOR over W22-N5 CONNECTOR
Built 1976
S5&S57-E22 CONN over N5-W22 CONNECTOR RAMP
Built 1994
E22-S5 CONNECTOR over S5&S57-E22 & S57-S5 RMPS
Built 2008
S57-E22 CONNECTOR over I 5 & CONNECTOR RAMPS
Built 1995
STATE ROUTE 22 over I-5 & CONNECTORS
Built 1995
S5&S57-W22 CONN over S57-BRISTOL ST OFF-RAMP
Built 1963
Bridge Details
- Structure #
- 55 0692E
- Year Built
- 1995
- Length
- 214.3 m (703.1 ft)
- Max Span
- 57.3 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 8,200
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.