E. LAMBERT ON-RAMP over LAMBERT RD

12-ORA-057-20.88-BRE · County 059, California · Built 2022 · 1 Lanes · 24,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
55 0492S
Year Built
2022
Length
53.2 m (174.5 ft)
Max Span
53 m
Width
12 m (39.4 ft)
Lanes
1
Daily Traffic
24,500
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.